Grand Casino Relocation
|
|
The relocation of Pine County Road 15 was required to make way for the casino expansion. The project consisted of the construction of 3,500 linear feet of two-lane section with turn lanes and bypass lanes for the casino entrances and a new intersection with MN State Highway 48. The project also included wetland mitigation and right-of-way vacation and dedication.
MFRA provided the following services: - Boundary and topographic survey
- Preliminary and final site design including plan and profile, grading, storm drainage, and striping
- Stormwater management system design
- Wetlands impact mitigation and permitting
- Construction administration and construction staking
|